Noah Ark · Reinforced safety module

A real shelter

Two modular configurations for protection, autonomy and temporary shelter in homes, estates, resorts and critical facilities. Built in the factory, shipped assembled and commissioned on site.

Commercial catalogue · September 2026

Two configurations for two different needs

What separates the versions is not the finish: it is how many people fit inside and how many hours it can hold on its own. Everything else — structural reinforcement, multipoint security door, climate control and basic emergency systems — is in both.

  • BASIC · NA-20

    Essential configuration

    Compact module for 4–6 occupants and a 24-hour autonomy target.

    €250,000 VAT not included

    • Reinforced structure and multipoint security door
    • 10 kWh battery and 6–8 kVA generator
    • Compact bathroom, kitchen, fridge, storage and climate control
    • Five-point seats, fire and intrusion detection
    • 4G/5G, internal Wi-Fi, cameras and GPS beacon
  • TOP · NA-40

    Extended platform

    Double-length platform for 6–8 occupants and a 72-hour autonomy target.

    €400,000 VAT not included

    • Redundancy on critical equipment and a sealed fire bulkhead
    • 20 kWh battery and 10–12 kVA generator
    • 750 litres of drinking water and extended reserves
    • HEPA H13 filtration with dual fan and manual bypass
    • Satellite link included, on top of 4G/5G and beacon

BASIC and TOP, side by side

FeatureBASIC · NA-20TOP · NA-40
Indicative price €250,000 + VAT €400,000 + VAT
External dimensions 6.058 × 2.438 × 2.591 m 12.192 × 2.438 × 2.591 m
Target usable space ≈ 9.9 m² ≈ 21.2 m²
Protected occupancy 4–6 people 6–8 people
Base autonomy 24 hours 72 hours
Drinking water 300 L 750 L
LiFePO₄ battery 10 kWh 20 kWh
Generator set 6–8 kVA 10–12 kVA
Ventilation F7 + activated carbon HEPA H13 + activated carbon
Satellite link Optional Included
Emergency oxygen Optional Basic reserve
Target installed mass 10–16 t 18–28 t

Base prices cover reinforced security. Certified armour, CBRN, EMP, full seismic isolation and collapse reinforcement are quoted separately.

Modular protection architecture

The base objective is a reinforced, self-sufficient space. Special performance depends on the packages contracted.

  1. 01

    Sacrificial skin

    Replaceable outer panel, anti-corrosion protection and first-stage impact dissipation.

  2. 02

    Primary frame

    Closed frames, longitudinal reinforcement and continuous load paths.

  3. 03

    Multilayer protection

    Structural steel and anti-intrusion protection. Aramid, ceramic and certified armour are optional.

  4. 04

    Sealed envelope

    Sealing against water, dust and smoke. Overpressure and the CBRN package are optional.

  5. 05

    Inner capsule

    Floating floor, anchored furniture and life systems on anti-vibration mounts.

The module end to end: command station, harnessed seats, kitchen and stores, compact bathroom, water tanks and the power and climate cabinet.
TOP · NA-40 version, end to end

Where it goes

  • Surface

    Fast installation on a slab within a protected perimeter.

  • Integrated

    Connected to a villa, a resort or a critical facility.

  • Semi-buried

    Discretion, thermal protection and controlled access.

  • Underground

    Dedicated civil works, drainage and redundant escape routes.

Every location requires geotechnical, structural, access, ventilation and evacuation studies.

What keeps the module standing

  • Sealed door, operable without power

    Reinforced steel leaf of 80–120 mm, welded structural frame and multipoint locking with four to six bolts. Electronic access control with mechanical backup, anti-prying protection and a drained threshold. Final resistance depends on the installed assembly: leaf, frame, anchors, hinges, lock and seals.

  • Anchoring and seismic protection

    BASIC uses elastic mounts and anti-tipping anchors; TOP, reinforced elastomeric bearings. Mechanical stops with calculated clearances, flexible connections with shut-off valves for water, power and drainage, and a tilt sensor as standard. Full seismic isolation with certified bearings is quoted separately.

  • Filtered ventilation and oxygen

    ≥ 200 m³/h in BASIC and ≥ 350 m³/h in TOP. F7 with activated carbon or HEPA H13 depending on version, sensors for CO₂, CO, smoke, temperature and humidity, and a dual fan with manual bypass in TOP. The overpressure kit and the certified CBRN package are optional.

  • Power and operational autonomy

    Silent diesel generator with ATS and external exhaust, LFP battery for critical loads and optional 2–4 kWp solar. Load management works in three tiers: air, control and communications first; water and refrigeration next; comfort last, with automatic shedding of non-critical loads.

  • Communications, beacon and command

    4G/5G router with a wired network for critical equipment, GNSS beacon with SOS message and its own battery, and a local panel showing power, water, access, cameras and alarms. The satellite link is included in TOP. EMP cabinet and hardened communications are quoted separately.

  • Real habitability

    Individual seats anchored to structural rails with five-point harnesses, enough spacing to evacuate in low light, a compact bathroom with separated grey and black water, a 90 or 150 L fridge and an electric hob. First-aid kit included; defibrillator and telemedicine optional.

What is included and what is quoted separately

Base prices do NOT include ballistic, blast, CBRN or EMP protection. These are quoted separately and increase mass, cost, lead time and foundation requirements.

  • Included

    Anti-intrusion

    Structural reinforcement, metal panels and protection of access points.

  • Optional

    Ballistic

    Certified envelope and glazing at the contracted level (EN 1522/1523 and EN 1063).

  • Optional

    Blast

    Specific solution defined by engineering and testing, only in special configurations.

  • Optional

    CBRN / EMP

    Advanced filtration, sealed overpressure and dedicated electronic protection.

From engineering to handover

  1. 01

    Site engineering

    Survey, geotechnics, loads, access, crane, permits and escape routes.

  2. 02

    Factory build

    Frame, armour, systems, interior, factory testing and documentation.

  3. 03

    Special transport

    Transport frame, escort where applicable and lifting plan.

  4. 04

    Civil works and lift

    Slab, pit or gallery, drainage, isolators, anchors and connections.

  5. 05

    Commissioning

    Tightness test, loads, communications, training and maintenance plan.

  • 14–22 weeks

    target build time by version and factory load

  • 1–3 weeks

    installation and commissioning, civil works aside

  • 2 per year

    recommended preventive maintenance

  • 24/7

    optional remote monitoring

The module, inside and out

Boards from the September 2026 commercial catalogue.

0103

Next step

Security audit and technical proposal

The technical visit inspects access, perimeter, network, power and lighting. The baseline report delivers the main risks and a proposed architecture.

Request an audit

BASIC from €250,000 · TOP from €400,000 (VAT not included)